Feb 18, 2020· Wetvolumeof concrete= 100m2×0.15m. Wv = wetvolume= 15 m2. Now we have to calculatedry volumecalculatingdry volumewe should multiply a cofactor 1.54 in wetvolume.Nowdry volumeof concrete= 15m2×1.54.Dry volume= 23.1 m2. Mix ratio inM10grade = 1:3:6 one partcement…

Get Price

Our Products Product

More details

  • How to calculate quantity of cement in PCC Civil Sir
    How to calculate quantity of cement in PCC Civil Sir

    Feb 18, 2020· calculation of cement quantity in pcc 1:2:4. Weight =volume ×density.Density of cement = 1440kg/m3. Dry volume = 23.1m3. One bag cement weight =50kg. Part of cement in mix =1/7. Weight = (1/7) 23.1m3×1440 kg/m3. Weight of cement = 4752 kg. Bags of cement = 4752/50= 95 bags. 95 bags (4752 kg) cement consumption in pcc 1:2:4 for 100m2 and 150 mm thick slab.

  • Cement Concrete Calculator PCC Calculator RCC
    Cement Concrete Calculator PCC Calculator RCC

    Strength of PCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 (n/mm 2 must be read as 'Newton’s per millimeter Cubic') compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mixconcretethat are normally used are 1:3:6 or 1:4:8.

  • PCC Volume Calculator Free Estimate of Cement, Sand, Jelly
    PCC Volume Calculator Free Estimate of Cement, Sand, Jelly

    PlainCement Concrete(PCC) is composed mixtureof cement, aggregates, sand, water and chemical admixtures. Calculateportland cement concreteor PCCconcretemix design ratio in Cft and determine exactly how muchquantity of cement, sand and aggregate is required for PCC construction.

  • Session 6 PCC Work (Plain Cement Concrete) (Free Online
    Session 6 PCC Work (Plain Cement Concrete) (Free Online

    Which can be generally given in drawing isM10& M15. ...Concrete Quantityof Footing PCC: 1.800mX1.800mX0.150: 0.486 Cubic Meters 9 Checklists. Checklist for PlainCement Concreteis called Pour Card. 1 Excavation Level, Plinth Top Level, Thickness of PCC is Checked.

  • Grades of Concrete Different Grades of Concrete M10, M15
    Grades of Concrete Different Grades of Concrete M10, M15

    Dec 16, 2019· 4CEMENTSAND AND AGGREGATE REQUIRED FOR M15,M10, M7.5, M5, M3 GRADECONCRETE? 4.0.1 For 20mm aggregate: 4.0.2 For 40mm aggregate: 4.0.3Amountof water needed for mixingconcrete? 4.0.4 Calculation of weight of sand and aggregate per bagof Cement? 4.0.5 For M20 GradeConcrete; 4.0.6 Sand and Aggregate per bagof cement– M5, M7.5,M10, M15 ...

  • Calculate Cement Sand Aggregate M20, M15, M10, M5
    Calculate Cement Sand Aggregate M20, M15, M10, M5

    Hence in order to prepare 1 cubic meter of M20, M15 and M10 concrete you need1.57 cubic metersof “total dry volume:” of cement, sand and aggregate and incase of M7.5 and M5 concrete you need 1.52 cubic meters total dry volume of cement sand and aggregate.

  • Concrete Mix Design Different Grades of Concrete
    Concrete Mix Design Different Grades of Concrete

    May 17, 2017· To calculate the Quantity of Cement in Concrete the following formula is used.Volume of Cement = Cement ⁄ Cement+Sand+Aggregate x 1.57.For 1m 3 of Concrete = 403.2Kgs of Cement is required. No. of Cement Bags required for 1m 3 of Concrete = 403/50 = 8.06 ~ 8 bags Hence we require 8 bags of cement for 1m 3 of concrete. Also Read:

  • Difference between lean concrete and PCC Concrete
    Difference between lean concrete and PCC Concrete

    M10GRADEOF CONCRETE→ 1:3:6 (CEMENT:SAND:AGGREGATES) {10mpa}. M15 GRADEOF CONCRETE→1:2:4 (CEMENT:SAND:AGGREGATES) {15mpa}. Main Purpose of PCC:-It is used as a protective layer for the RCC above so that water from the RCC is not absorbed by the earth below. Moisture available in soil should not absorbed by R.C.C footings which causes corrosion of …

  • how to calculate the aggregate in pcc
    how to calculate the aggregate in pcc

    calculationof cementin pcc. How to CalculateCementSand and Aggregate required for 1 Jun 10 2018M10GRADE M15 GRADEof concreteis used as PCC PlainCement Concrete CEMENT QUANTITY IN M 10To calculate it you must know the following 2 things 1 Mix proportion of

  • PCC ConcreteCalculation PCC ConcreteRatio Plain
    PCC ConcreteCalculation PCC ConcreteRatio Plain

    PCCis applied over brick flat soling or without brick flat soling. Plaincement concreteis also known as "cement concrete(CC)" or "bindingconcrete". Materials required for formingPCC:Cement: Usually the Portlandcementis applied as bonding material inPCC. Fine Aggregate: Sand is applied as fine aggregate. The FM of sand should be 1.2 to ...

  • plaincement concrete m 10mix design calculations
    plaincement concrete m 10mix design calculations

    It has a high effect on the strength and workabilityof concrete. So, in this article, we’ll briefly discuss the calculation, maximum and minimum value of the watercement ratio forM10, M15, M20, and M25, etc. In theconcreteMix design, the ratio between water to theamount of cement(by weight) is known as a watercement ratio.

  • How To CalculateOf Cement, Sand And Aggregate ForM10
    How To CalculateOf Cement, Sand And Aggregate ForM10

    Wet volumeof concrete= 1 m³. Dry volume = Wet volume x 1.54 (You can also take it as 1.50 to 1.55, But it became standard practice to considering 1.54 as multiplication factor). Dry volumeof concrete= 1 x 1.54 =1.54 m³. 1- Find-outquantity of Cement.Quantity of cement= (Dry volumeof concretexcementratio)/(sum of the ratio)

  • PCC CalculatorFor Concreting Work Ernakulam Kerala
    PCC CalculatorFor Concreting Work Ernakulam Kerala

    Sep 21, 2017· Example for Calculating theQuantityof Materials In 1 CUMof Concrete. Considerconcretewith mix (M10) of proportion 1:3:6 = 10 where, 1 is partof cement, 2 is part of fine aggregates and 4 is part of coarse aggregates of 20mm Size.

  • Session 6 PCCWork (PlainCement Concrete) (Free Online
    Session 6 PCCWork (PlainCement Concrete) (Free Online

    Which can be generally given in drawing isM10& M15. ...Concrete Quantityof FootingPCC: 1.800mX1.800mX0.150: 0.486 Cubic Meters 9 Checklists. Checklist for PlainCement Concreteis called Pour Card. 1 Excavation Level, Plinth Top Level, Thickness ofPCCis Checked.

  • PCC ConcreteRatio PlainCement Concrete Calculate
    PCC ConcreteRatio PlainCement Concrete Calculate

    Where 1 signifies the ratioof cement, 2 signify the ratio of sand (fine aggregate) and 4 for coarse aggregate (crushed stone). Dry volume = wet volume x 1.54. Determine crushed stone,cementand sand inPCCwork.Concreteratio is 1:2:4. Material is equal to material ratio/ratio sum x dry volume.Cementis equal to 1/1 + 2 + 4 x wet volume x 1.54

  • Rate Analysis of PCC (Plain Cement Concrete)
    Rate Analysis of PCC (Plain Cement Concrete)

    Aug 01, 2019· In General Condition Lot of builders and Subcontractors are sublating this work on Sqft basis or Per Bag basis to Subcontractor orConcretegang Who can do it onPCCRs. 6.00/ Sqft and PlumConcretein 8.50 to 9.00 Rs. Per Cuft that is 300 Per Cum

  • PCC ConcreteCalculation PCC ConcreteRatio Plain
    PCC ConcreteCalculation PCC ConcreteRatio Plain

    PlainCement Concrete(PCC) refers to the construction material that is usually applied as the binding materials. It is formed withcement, (generally PortlandCement) and other cementitious materials like fly ash and slagcement, aggregate (normally a coarse aggregate) created with gravels or crushed rocks like limestone or granite, along with a fine aggregate like sand as well as water, and ...

  • Plaincement concrete(PCC) Materials, Properties, and Mixing
    Plaincement concrete(PCC) Materials, Properties, and Mixing

    Plaincement concrete(PCC) is a hardened mass obtained from a mixtureof cement, sand, gravel, and water in definite proportions. ... GenerallyM10(1:3:6) or M15 (1:2:4) mix is used. ... Thequantityof dry aggregate, fine aggregate, andcementis measured and should be placed in their respective hoppers.

  • Difference between lean concrete and PCC Concrete
    Difference between lean concrete and PCC Concrete

    M10GRADEOF CONCRETE→ 1:3:6 (CEMENT:SAND:AGGREGATES) {10mpa}. M15 GRADEOF CONCRETE→1:2:4 (CEMENT:SAND:AGGREGATES) {15mpa}. Main Purpose ofPCC:-It is used as a protective layer for the RCC above so that water from the RCC is not absorbed by the earth below. Moisture available in soil should not absorbed by R.C.C footings which causes corrosion of …

  • Concrete Mix Design Calculations Civil Engineering
    Concrete Mix Design Calculations Civil Engineering

    SendQuantity of Cement(no of PakistaniCementBags), Sand (unit=Cubic Feet) & Crush (unit=Cubic Feet)of 100 Cbic Feetconcretein Ratios as below: ...concretefor a building project. 1)PCC1:4:8 – 40mm and down size. 2)RCC 1:3:6 – 20mm and down size ... gradeof concrete M10M15 M20 M25 M30 M35 M40 M50 M60 Please send as early as ...

  • how to calculate the aggregate inpcc
    how to calculate the aggregate inpcc

    calculationof cementinpcc. How to CalculateCementSand and Aggregate required for 1 Jun 10 2018M10GRADE M15 GRADEof concreteis used asPCCPlainCement Concrete CEMENT QUANTITY IN M 10To calculate it you must know the following 2 things 1 Mix proportion of

  • Concrete Calculator
    Concrete Calculator

    This freeconcrete calculatorestimates theamount of concretenecessary for a project, and can account for different shapes and amountsof concrete. Explore other calculators related to housing or building, as well as hundreds of other calculators addressing finance, math, fitness, health, and more.

  • find howmuch sand and aggregate in m10 ratio calculations
    find howmuch sand and aggregate in m10 ratio calculations

    Nov 06, 2012· give me the mix proportion for design mixconcrete M10grade 1:4:8.M10grade Ratio is 1:3:6 And 1:4:8 is M7.5 … 1 4 8 meanscementsand (fine aggregate) metal 20 …how muchquantitya skilled labour and unskilled doesPcc… »More detailed

  • How to Calculate Quantitiesof Cement, Sand and Aggregate
    How to Calculate Quantitiesof Cement, Sand and Aggregate

    PCCshould be usually be done with M15, so we haven’t given the ratio forM10. Chetan chougule. September 25, 2017 at 9:00 pm. ... Tell me how if i need to calculate quantities of aggregate size 10 mm and 20 mm for 1 bagof cementand also thequantityof …

  • how we calculatem10 concrete
    how we calculatem10 concrete

    how we calculatem10 concrete. As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including quarry, aggregate, and different kinds of minerals. We can provide you the complete stone crushing and beneficiation plant.We also supply stand-alone ...

  • What arePlain Cement Concrete (PCC) Cement Concrete (CC
    What arePlain Cement Concrete (PCC) Cement Concrete (CC

    Jul 20, 2017· The Grade ofPCCshall be a minimum ofM10. Before layingPCCthe soil on which it is to be laid shall be well compacted and ramped. Generally it is made of 1 Partof Cement, 3 to 4 Parts of Sand and 6 to 8 Parts of 40 mm Aggregates.

  • QuantityOf Sand InPcc
    QuantityOf Sand InPcc

    QuantityOf Sand InPcc. PlainCement Concrete(PCC) is composed mixtureof cement, aggregates, sand, water and chemical admixtures. Calculateportland cement concreteorPCC concretemix design ratio in Cft and determine exactly how muchquantity of cement, sand and aggregate is required forPCC…

  • Difference between lean concrete and PCC Concrete
    Difference between lean concrete and PCC Concrete

    M10GRADEOF CONCRETE→ 1:3:6 (CEMENT:SAND:AGGREGATES) {10mpa}. M15 GRADEOF CONCRETE→1:2:4 (CEMENT:SAND:AGGREGATES) {15mpa}. Main Purpose ofPCC:-It is used as a protective layer for the RCC above so that water from the RCC is not absorbed by the earth below. Moisture available in soil should not absorbed by R.C.C footings which causes corrosion of …

  • DifferentGrades Of Concrete Based On IS, American
    DifferentGrades Of Concrete Based On IS, American

    { Note: In C10 gradeconcrete‘C’ representsConcreteStrength Class and 10 represents 10 N/mm² Compressive Strengthof [email protected] 28 days when tested with the 15cm dia & 30cm height cylinder in a direct compression test. 1.2.1. Standard strengthconcretegrades . a. C10ConcreteGrade. It is also known as Gen1concrete. It gains 10 N/mm² compressive strength in 28 days.

  • How To CalculateCement, Sand AggregatesQuantityin
    How To CalculateCement, Sand AggregatesQuantityin

    Aug 03, 2018·Cement= (1/5.5) x 1.54 = 0.28 m 3 ∴ 1 is a partof cement, 5.5 is sum of ratio Densityof Cementis 1440/m 3 = 0.28 x 1440 = 403.2 kg We know each bagof cementis 50 kg For Numbers of Bags = 403.2/50 = 8 Bags

  • Concrete Mix Design for M10 grade Civil4M
    Concrete Mix Design for M10 grade Civil4M

    Dec 24, 2017·Concrete Mix Design for M10 grade of concrete M10is lean mixconcreteand can be used in any nonstructural work. Mostly use forPCCWorksConcrete mix Design for M10 Grade concretewith pure PPCcementonly is as follows; PPCCement53 Grade – 220 Kg WaterCementratio (w/c) – 0.6 Free Water – 132 liters 20mm Metal / Aggregates – 666 Kg

  • How to CalculateCement, Sand and Coarse Aggregate
    How to CalculateCement, Sand and Coarse Aggregate

    ConcreteIngredients Calculation. ForCement, Sand and Coarse Aggregate. This is a Volumetric Calculation. Assuming we need 2 m 3of concretefor M20ConcreteMix, (Mix Ratio, M20 = 1 : 1.5 : 3) Total Part of theConcrete= 1+1.5+3 = 5.5 Parts. Therefore,Cement Quantity= (CementPart /ConcreteParts ) *ConcreteVolume

  • Plain Cement Concrete (PCC) Work Procedure
    Plain Cement Concrete (PCC) Work Procedure

    PCCis allowed to be done by hand-mixing only for small-scale works. The base on which theconcreteis mixed must be clean, watertight slab or a steel platform. Sand andcementare mixed thoroughly followed with the addition of coarse aggregate. Lastly, water is added and the mixture is mixed properly to gain an even colour and consistency.

  • CalculationOf CementBags ForConcrete In M10 Pcc MC World
    CalculationOf CementBags ForConcrete In M10 Pcc MC World

    cementconsumption inPCC1:3:6 andM10- Civil Sir.cementconsumption inPCC1:3:6, How to calculatequantity of cementinPCC, in this topic we know about how to calculatequantity of cementinPCCandcementconsumption inPCC1:3:6.we know that we have several gradeof concretelike M5, M7.5,M10, M15, M20 and M25 and so more- and watercementratio forM10gradeof concrete.

  • Session 6 PCCWork (PlainCement Concrete) (Free Online
    Session 6 PCCWork (PlainCement Concrete) (Free Online

    Which can be generally given in drawing isM10& M15. ...Concrete Quantityof FootingPCC: 1.800mX1.800mX0.150: 0.486 Cubic Meters 9 Checklists. Checklist for PlainCement Concreteis called Pour Card. 1 Excavation Level, Plinth Top Level, Thickness ofPCCis Checked.

  • how muchquantity1 cumpccincement
    how muchquantity1 cumpccincement

    How to calculate thequantity of cementinPCC- Quora If the ratio ofPCCis 1:4:8Quantity of Cementper cubic meterof concreteis =1 x 1.5/(1+4+8)=0.115 cu.

  • pcc148cementsand calculation ME Mining Machinery
    pcc148cementsand calculation ME Mining Machinery

    cementconsumption inPCC1:4:8 and M7.5,h ow to calculatequantity of cementinPCC, in this topic we know about how to calculatequantity of cementinPCCandcementconsumption inPCC1:4:8.we know that we have several gradeof concretelike M5, M7.5,M10, M15, M20 and M25 and so more- and watercementratio for M7.5 gradeof concrete..